NVIDIA, read move by move: 56 disclosed moves across nine capability branches between January 2024 and September 2026, sorted by what each one buys. Written for enterprise buyers of AI infrastructure and the leaders who approve that spend.

Published
September 2026
Version
v1.0
Length
19 pages
Author
Joseph Abraham

Key facts

  • NVIDIA made 56 disclosed acquisitions, licence deals, investments, financing commitments, partnerships, launches and wind-downs between January 2024 and September 2026, and financing is the largest branch with 8 of the 56 moves.
  • NVIDIA held about $99 billion of equity investments on 26 July 2026, against about $7 billion a year earlier, according to its Q2 FY2027 quarterly filing as reported by CNBC.
  • NVIDIA's Form 8-K of 17 August 2026 caps its conditional residual value guarantees for OpenAI's leased campus at SB Energy's PORTS-Pike site in Ohio at $105 billion, covering about 4.25 gigawatts of IT load.
  • NVIDIA signed a definitive agreement on 2 September 2026 to acquire Hugging Face for about $11.9 billion plus an equity retention programme of up to about $1.0 billion, with closing expected in the first half of 2027 subject to regulatory approval.
  • NVIDIA's September 2025 letter of intent to invest up to $100 billion in OpenAI was never finalised, and NVIDIA instead took a $30 billion equity stake in OpenAI's funding round announced on 27 February 2026.
  • Two direct customers accounted for 22 per cent and 14 per cent of NVIDIA's FY2026 revenue of $215.9 billion, according to NVIDIA's Form 10-K for the fiscal year ended 25 January 2026.

NVIDIA is no longer only selling chips to the companies that build AI. Across 56 disclosed moves between January 2024 and September 2026, it licensed, bought, financed or guaranteed its way into almost every layer around the GPU, and the largest single branch of that activity is financing its own customers.

Section one

What has NVIDIA actually done since January 2024?

NVIDIA has built a ring of ownership, licences and credit around the GPU. The Forum read every disclosed move from January 2024 to September 2026 and sorted each by the capability it buys. The result is 56 moves in nine branches, with five wind-downs, three licence-and-hire deals and two financing commitments.

The largest branch is not a technology. Financing the AI factory holds 8 of the 56 moves, more than inference, networking or models.

56disclosed moves, January 2024 to September 2026
$99Bequity investments held on 26 July 2026
36%FY2026 revenue from two direct customers
The AI Radar canvas for NVIDIA, showing 56 disclosed moves grouped into nine capability branches, each move marked by type: acquisition, licence and hire, investment, financing commitment, partnership, built in house or wound down.
The NVIDIA AI Radar: 56 disclosed moves in nine branches, January 2024 to September 2026. Source: Global AI Forum, AI Radar GAIF-AR-002, September 2026.

Section two

Where does NVIDIA's revenue now come from?

Revenue more than doubled in a year. NVIDIA reported $96.2 billion for the quarter ended 26 July 2026, up 106 per cent on the $46.7 billion of the same quarter a year earlier, and guided the quarter to October 2026 to $108.0 billion, plus or minus 2 per cent, with no Data Center compute revenue from China assumed.

Quarterly revenue doubled in twelve months

NVIDIA revenue by fiscal quarter, $ billions, Q2 FY2026 to Q2 FY2027

100 50 0 Q2 FY26 Q3 FY26 Q4 FY26 Q1 FY27 Q2 FY27 $46.7B $96.2B
Source: NVIDIA quarterly results releases, Q2 FY2026 to Q2 FY2027 (26 August 2026). Q3 FY2026 value of $57.0 billion as reported from the 10-Q by The Motley Fool, 27 November 2025.

Hyperscale and everyone else now sit almost level. Under the reporting framework NVIDIA introduced in May 2026, Data Center revenue of $89.0 billion in Q2 FY2027 split into $48.7 billion from Hyperscale and $40.3 billion from ACIE, which covers AI clouds, industrial and enterprise customers. ACIE grew 138 per cent year over year in that quarter.

The half that is not the hyperscalers grew faster

Hyperscale against ACIE revenue, $ billions, Q1 FY2027 and Q2 FY2027

Hyperscale ACIE Q1 FY2027 37.9 37.4 Q2 FY2027 48.7 40.3
Source: NVIDIA Q1 FY2027 results (May 2026) and Q2 FY2027 results and earnings call (26 August 2026); Q2 sub-market values as reported by CNBC and The Next Platform, 26 and 27 August 2026. The call rounded them to $49B and $40B.

Concentration remains high. In FY2026, two direct customers accounted for 22 per cent and 14 per cent of revenue of $215.9 billion. NVIDIA does not name them, and direct customers are often system builders rather than end users.

Two direct customers made up 36 per cent of FY2026 revenue

Share of NVIDIA revenue by direct customer, FY2026, total = $215.9 billion

A 22% B 14% All other customers 64%
Source: NVIDIA Form 10-K for the fiscal year ended 25 January 2026, direct customers note. n = FY2026 revenue of $215.9 billion.

Section three

Which capabilities is NVIDIA buying?

Nine branches, and money leads. Financing the AI factory holds 8 moves. Fabric and light, open models and data, and physical AI and quantum hold 7 each. Structure and disclosure, the branch most analyses leave out, holds 4, and three of its moves change what investors can see.

Financing is the largest branch on the map

Disclosed NVIDIA moves per capability branch, count, January 2024 to September 2026

Financing the factory 8 Fabric and light 7 Open models and data 7 Physical AI, quantum 7 Inference hedge 6 Silicon alliances 6 Control plane 6 Frontier labs 5 Structure, disclosure 4
Source: Global AI Forum, AI Radar GAIF-AR-002, September 2026, section three. n = 56 moves. Bar length is proportional to the largest value.

Most branches were financed, not bought

Capability branches against how NVIDIA entered them, January 2024 to September 2026

Acquired Licensed in Financed Wound down Inference hedge Fabric and light Silicon alliances Control plane Open models and data Physical AI and quantum Frontier labs Financing the factory Structure and disclosure
Filled is present, blank is absent. Financed covers equity investments and financing commitments. Source: Global AI Forum, AI Radar GAIF-AR-002, September 2026, sections three to eight.
Licence and hire
A deal in which NVIDIA pays for a non-exclusive licence to a company's technology and hires its founders and engineers, while the company continues as a separate legal entity.
Financing commitment
A guarantee or financing arrangement NVIDIA provides for AI infrastructure that is neither an equity stake nor an operating partnership, such as a lease guarantee or a capital platform.
Wind-down
A move NVIDIA reversed, retired or did not complete, including business models it stepped back from and reporting lines it stopped publishing.
ACIE
NVIDIA's reporting sub-market for AI clouds, industrial and enterprise customers, introduced in May 2026 alongside Hyperscale within Data Center revenue.

Section four

Every disclosed move, in one ledger

The ledger lists all 56 moves on the radar. Values are in US dollars as disclosed or reported. Where NVIDIA has not confirmed a figure, the ledger says so.

NVIDIA's disclosed moves by type, January 2024 to September 2026, value in $ billions.
Move Type Date What it buys Value, $B
GroqLicence and hireDec 2025Inference processor design, founder and most staff. Price reported, not confirmed by NVIDIA.about 20.0
Groq 3 LPXBuiltMar 2026Inference rack that sits beside Vera Rubin.n/a
DynamoBuiltMar 2026Open-source inference serving software.n/a
CentMLAcquisitionJun 2025Compiler and inference optimisation.not disclosed
OctoAIAcquisition2024 [to confirm]Inference serving.[to confirm]
DeciAcquisition2024 [to confirm]Model optimisation.[to confirm]
EnfabricaLicence and hireSep 2025Fabric for clusters above 100,000 GPUs, CEO and team. Reported as over $0.9B.over 0.9
CoherentInvestmentMar 2026Lasers for co-packaged optics, with purchase commitments.2.0
LumentumInvestmentMar 2026Lasers and optical components.2.0
MarvellInvestmentMar 2026Silicon photonics and NVLink Fusion integration.2.0
CorningInvestmentMay 2026Warrants inside an arrangement worth up to $3.2B, with three new US fibre plants.0.5
Ayar LabsInvestment2026 [to confirm]Participation in a $0.5B Series E for optical input and output.not disclosed
Spectrum-6 opticsBuilt2026Switches with co-packaged optics.n/a
IntelInvestmentSep 2025, closed Dec 2025Custom x86 CPUs with NVLink and x86 system-on-chips with RTX graphics.5.0
SynopsysInvestmentDec 2025GPU acceleration inside chip design software.2.0
SK hynixPartnership2026 [to confirm]Multiyear next-generation memory partnership.not disclosed
NVLink Fusion in TrainiumPartnershipDec 2025NVIDIA interconnect inside AWS's own accelerators.not disclosed
Vera CPUBuilt2026Standalone CPU positioned for AI agents.n/a
Arm stakeWound down2026 [to confirm]Arm shares sold, per NVIDIA's 13F.nil
Run:aiAcquisitionDec 2024GPU orchestration on Kubernetes, closed after EU review.about 0.7
SchedMDAcquisitionDec 2025Slurm, the open-source supercomputer scheduler.not disclosed
Hugging FaceAcquisitionSep 2026, signedOpen-model platform. Closing expected H1 2027. Excludes up to $1.0B retention.11.9
Lepton AIAcquisitionApr 2025GPU rental platform, reported at hundreds of millions.not disclosed
DGX Cloud LeptonBuilt2025Marketplace routing demand to partner clouds.n/a
DGX Cloud, sold directWound downSep 2025Enterprise cloud sales scaled back, as reported by The Information.nil
PoolsideLicence and hireAug 2026Model Factory software and more than 100 engineers: $6.0B licence plus $1.0B equity, reported.7.0
Nemotron CoalitionPartnershipMar 2026Open frontier model group with Mistral, Perplexity and others.not disclosed
Reflection AIInvestment[to confirm]Open-model developer.[to confirm]
NemoClawBuiltMar 2026Enterprise-secure reference stack for the OpenClaw agent framework.n/a
GretelAcquisitionMar 2025Synthetic data. Reported above a $0.32B valuation.not disclosed
Kumo AIAcquisitionJun 2026Foundation model for predictions on business data, reported above $0.4B.over 0.4
IllumexAcquisitionFeb 2026Semantic layer for enterprise data.not disclosed
Skild AIInvestment2026 [to confirm]Co-led a $1.4B round with SoftBank for a general-purpose robot model.not disclosed
Uber robotaxiPartnershipOct 2025Fleet target of 100,000 vehicles on DRIVE Hyperion.not disclosed
NokiaInvestmentOct 2025About 2.9 per cent stake for AI-RAN.1.0
Cosmos 3Built2026Open world model for physical AI.n/a
GR00T reference humanoidBuilt2026Open humanoid robot reference design on Jetson Thor.n/a
Four quantum stakesInvestment2025 to 2026Quantinuum, QuEra, PsiQuantum and Alice & Bob.not disclosed
NVQLinkBuilt[to confirm]Interconnect linking quantum processors to GPUs.n/a
OpenAIInvestmentFeb 2026Equity stake; OpenAI committed to 3 GW inference and 2 GW training on Vera Rubin, as reported.30.0
AnthropicInvestmentNov 2025Up to $10.0B; up to 1 GW on Grace Blackwell and Vera Rubin.up to 10.0
xAIInvestmentJan 2026Now held as a SpaceX stake, reported at about $21B on 30 June 2026.over 10.0
Safe SuperintelligenceInvestment[to confirm]Frontier lab stake, reported, not confirmed by NVIDIA.5.0
OpenAI letter of intentWound downSep 2025 to Mar 2026Up to $100B tied to 10 GW, never finalised.nil
CoreWeaveInvestmentJan 2026Additional shares at $87.20 on top of an existing stake.2.0
NscaleInvestmentSep 2025UK and European AI cloud capacity.about 0.7
IRENInvestmentMay 2026Warrants and a right to invest up to $2.1B; IREN to deploy up to 5 GW of DSX designs.up to 2.1
SB EnergyInvestmentAug 2026Equity in the developer of OpenAI's Ohio campus.1.5
Ohio lease guaranteeFinancingAug 2026Capped, conditional residual value guarantees on about 4.25 GW.cap 105.0
Compute financing platformsFinancingAug 2026Memorandums with six asset managers to mobilise over $500B of third-party capital.not disclosed
HUMAINPartnershipMay 2025Saudi AI factories of up to 500 MW.not disclosed
Deutsche TelekomPartnershipNov 2025One billion euro Industrial AI Cloud for German industry.not disclosed
Two-platform reportingBuiltMay 2026Data Center split into Hyperscale and ACIE, plus Edge Computing.n/a
SBC inside non-GAAPBuiltMay 2026Stock-based compensation no longer excluded from non-GAAP results.n/a
Compute and networking splitWound downAug 2026 [to confirm]Not broken out in the Q2 FY2027 release.nil
Gaming as its own lineWound downMay 2026Folded into Edge Computing.nil
Moves on the radar. Values are not summed because they mix equity, licences, warrants and a capped conditional guarantee.56 moves

Scroll the table sideways to see every column.

Source: NVIDIA Form 10-K FY2026, Forms 8-K of 17 August and 2 September 2026, results releases Q4 FY2026 to Q2 FY2027, NVIDIA newsroom; CNBC, Fortune, Forbes, The Information, TechCrunch, Reuters and others, January 2024 to September 2026. Excludes undisclosed moves and deals still in negotiation, including reported talks with Thinking Machines Lab and Perplexity.

Section five

Why the biggest deals are not acquisitions

NVIDIA's most important capability additions arrive as licences plus hiring. Groq, Enfabrica and Poolside each left a company running independently while its technology and people moved to NVIDIA. The reported value of those three deals, about $20 billion, over $0.9 billion and $7.0 billion, exceeds every conventional acquisition in the window, including the $11.9 billion Hugging Face purchase price.

Speed is the first reason. Groq was licensed on 24 December 2025, and Groq 3 LPX was in full production by Q2 FY2027. Review is the second. Bernstein's Stacy Rasgon wrote in December 2025 that the Groq structure may keep the fiction of competition alive, and the roughly $0.7 billion Run:ai deal had already drawn a European Commission review under Article 22 despite falling below EU thresholds.

Finding

For any buyer tracking a vendor's capability, the largest additions no longer show up as acquisitions. Read the licences and the hiring, not only the deal list.

Section six

How much of its own demand does NVIDIA finance?

A growing share, and the exact share is not disclosed. NVIDIA holds equity in OpenAI, Anthropic, xAI, CoreWeave, Nscale and IREN, and each buys NVIDIA compute. In the first half of FY2027, to 26 July 2026, NVIDIA spent $42.4 billion buying equity securities and recorded $23.7 billion of gains on them.

$99B

Equity investments held by NVIDIA

About $99 billion on 26 July 2026, against about $7 billion a year earlier, plus about $25 billion of further equity commitments. Source: NVIDIA Q2 FY2027 Form 10-Q, as reported by CNBC, 4 September 2026.

The gains move both ways. NVIDIA's listed stakes were worth $63.4 billion on 30 June 2026 and about $46.4 billion by early September 2026, mostly because the Intel position fell from about $30 billion to about $19 billion.

Listed stakes lost about a quarter of their value in ten weeks

30 June 2026 to early September 2026, market value, $ billions

30 June 2026 Early September 2026 All listed stakes -17.0 Intel stake -11.0
Source: Dow Jones Market Data via TradingView, from NVIDIA's 13F for 30 June 2026 and prices in early September 2026. Assumes positions unchanged. Scale 0 to 70.

Section seven

What the $105 billion Ohio guarantee is, and is not

It is a cap on a conditional guarantee, not cash invested. NVIDIA's Form 8-K of 17 August 2026 describes residual value guarantees given to SB Energy on leases for about 4.25 gigawatts of IT load that OpenAI will occupy at the PORTS-Pike campus in Pike County, Ohio, under a 20-year lease. NVIDIA's aggregate obligation is capped at $105 billion and phases in from 2028.

In the base case, where OpenAI pays its rent, NVIDIA pays nothing. NVIDIA also holds an option to support about 3.75 further gigawatts, will be the exclusive AI compute provider on the site, and is investing $1.5 billion of cash in SB Energy. Jensen Huang rejected the circular-financing reading on X in August 2026, saying OpenAI will pay the lease.

$105B

Cap on NVIDIA's Ohio lease guarantees

Conditional residual value guarantees on about 4.25 gigawatts for OpenAI at SB Energy's PORTS-Pike campus, phasing in from 2028. Source: NVIDIA Form 8-K, 17 August 2026, Item 1.01.

Prudent use of a strong balance sheet

NVIDIA pays only if the tenant defaults and SB Energy recovers less than the guaranteed values. The guarantee makes a campus bankable that would otherwise take longer to finance, and it secures NVIDIA as the exclusive supplier.

Concentrated tail risk

Up to $105 billion of credit support is tied to one tenant, with an option to extend coverage by about 88 per cent in capacity terms. The same filing period saw a separate plan for over $500 billion of third-party financing. Contingent exposure is now part of NVIDIA's growth model.

Press reports in July 2026 described a backstop of $250 billion. The 17 August 2026 filing describes a smaller, capped and conditional instrument. The Forum uses the filed figure.

Section eight

When did NVIDIA change course?

  1. September 2025A cloud stepped back, a letter of intent signed

    The Information reported NVIDIA scaling back DGX Cloud sales to enterprises. NVIDIA announced the Intel stake, the Enfabrica licence and hire, and a letter of intent to invest up to $100 billion in OpenAI.

  2. November 2025Anthropic joins the balance sheet

    NVIDIA committed to invest up to $10 billion in Anthropic, which committed to up to 1 gigawatt of NVIDIA systems. Source: Microsoft, NVIDIA and Anthropic release, 18 November 2025.

  3. December 2025Groq and Slurm

    NVIDIA licensed Groq's technology and hired its leadership for a reported $20 billion, acquired SchedMD, and closed the $5 billion Intel stake.

  4. February 2026The $100 billion becomes $30 billion

    NVIDIA took a $30 billion stake in OpenAI's round announced on 27 February 2026, replacing the unsigned letter of intent. Source: CNBC, 4 March 2026.

  5. March 2026GTC and the optics buying

    NVIDIA launched Groq 3 LPX, NemoClaw and the Nemotron Coalition at GTC on 16 March 2026, and invested $2 billion each in Coherent, Lumentum and Marvell during the month.

  6. May 2026The reporting reset

    With Q1 FY2027 results, NVIDIA replaced its five market platforms with Data Center and Edge Computing, and split Data Center into Hyperscale and ACIE. Source: NVIDIA Q1 FY2027 results release.

  7. August 2026Financing becomes strategy

    NVIDIA announced financing platforms with six asset managers on 10 August, filed the $105 billion Ohio guarantee on 17 August, and licensed Poolside for a reported $6 billion.

  8. September 2026Hugging Face signed

    NVIDIA agreed to acquire Hugging Face on 2 September 2026, with closing expected in the first half of 2027. Source: NVIDIA Form 8-K, 2 September 2026.

Section nine

What NVIDIA stopped reporting

Four moves on the radar are about disclosure, and two remove a view investors used to have. Gaming lost its own line in May 2026, and compute and networking were no longer broken out in the Q2 FY2027 release [to confirm against the Q2 FY2027 CFO commentary]. Under the old framework, NVIDIA reported Q1 FY2027 networking revenue of $14.8 billion, up 199 per cent year over year, against compute revenue of $60.4 billion, up 77 per cent.

Two changes add information. The Hyperscale and ACIE split is more useful than what it replaced, and moving stock-based compensation inside non-GAAP results from Q1 FY2027 is the more conservative choice.

Finding

NVIDIA does not disclose how much of its ACIE revenue comes from companies it has financed or guaranteed, and that is the single most important number the map cannot supply.

What this research does not establish

  • The share of NVIDIA's Data Center revenue that comes from companies NVIDIA has financed, guaranteed or holds equity in. NVIDIA does not report it.
  • The terms of several deals NVIDIA has not confirmed, including the Groq price, the Poolside terms, the Kumo price, and the Safe Superintelligence and Reflection AI amounts.
  • Whether the Hugging Face acquisition will close on the stated terms, since it remains subject to regulatory approval expected in the first half of 2027.
  • Whether the six compute financing memorandums announced on 10 August 2026 will become definitive agreements, or at what scale.

Cite this as

Global AI Forum, Every move buys what the GPU cannot do alone, September 2026. GAIF-AR-002 v1.0. gaiforum.com

Sources

  1. Annual Report on Form 10-K for the fiscal year ended 25 January 2026, NVIDIA Corporation, 25 February 2026, direct customers and China disclosures.
  2. Financial Results for Second Quarter Fiscal 2027, NVIDIA Corporation, 26 August 2026, summary and highlights.
  3. Financial Results for First Quarter Fiscal 2027 and CFO Commentary, NVIDIA Corporation, May 2026, reporting framework.
  4. Financial Results for Fourth Quarter and Fiscal 2026, NVIDIA Corporation, 25 February 2026.
  5. Current Report on Form 8-K, NVIDIA Corporation, 17 August 2026, residual value guaranties with SB Energy.
  6. Current Report on Form 8-K, NVIDIA Corporation, 2 September 2026, Item 8.01, Hugging Face agreement.
  7. NVIDIA Partners With Apollo, BlackRock, Blackstone, Brookfield, Goldman Sachs and KKR, NVIDIA newsroom, 10 August 2026.
  8. Microsoft, NVIDIA and Anthropic announce strategic partnerships, Microsoft and NVIDIA newsrooms, 18 November 2025.
  9. NVIDIA Acquires Open-Source Workload Management Provider SchedMD, NVIDIA blog, 15 December 2025.
  10. Nvidia's investments grow to $99 billion, CNBC, 4 September 2026.
  11. Nvidia buying AI chip startup Groq's assets for about $20 billion, CNBC, 24 December 2025; and analyst commentary, CNBC, 26 December 2025.
  12. Nvidia CEO Huang says $30 billion OpenAI investment might be the last, CNBC, 4 March 2026.
  13. Nvidia backing $105 billion in financing for OpenAI data center in Ohio, CNBC, 17 August 2026; Axios, 17 August 2026.
  14. Nvidia spends $6.5B on photonics, The Next Web, June 2026; Nvidia to invest up to $3.2 billion in Corning, CNBC, 6 May 2026.
  15. Exclusive: Nvidia snaps up Kumo AI, Fortune, 3 June 2026; Nvidia Pays Poolside $6 Billion, Forbes, 24 August 2026.
  16. How Nvidia's investment juggernaut can jump from big to enormous, Dow Jones via TradingView, September 2026.
  17. Nvidia steps back from DGX Cloud, Tom's Hardware, 12 September 2025, citing The Information.

Global AI Forum · GAIF-AR-002 · v1.0 Research current as of 15 September 2026 gaiforum.com

Cite this asGlobal AI Forum, The Radar: Nvidia, 14 September 2026. GAIF-AR-002.